Category Archives: Switching

Automating the ECAD Testing Sequence

The approach for using the ECAD tester requires that the circuit under test be logically organized as a set of two-wire configurations.  For most circuits, the total number of combinations is manageable so that the time required to move the test lead connections between configurations is not significant.    The test lead connection time does, however,  become more significant as the number of two-wire configurations increases or if the number of similar circuits to be tested becomes large.

Continue reading Automating the ECAD Testing Sequence